Digging hole for install
This is where we are going to place a plate at the bottom, a smart jack through and solidify the center in concrete.
During the appointment
The spacing between the floor joists
Keeping things clean
We cover everything with plastic and tape the vents to limit dust to the rest of the house.
Supplemental beam and jacks
Installed supplemental beam and a jack view of the floor.
This is what we call the bulb of influence
Using gravel to keep everything balance and stable before we pour concrete to make it flush to the ground.
Finished install
Fresh concrete fills the pits and keeps the smart jack beams in place.